Value and Design come together to create a line of polyurethane
millwork designed to give all your projects a distinctive finish
...a designers finish.
Suggested
Ceiling Medallions
Polyurethane Installation
Place a solid bead of premium adhesive around and about the
Polyurethane mouldings may be installed much the same way you
backside of the medallion. Pressing the medallion into place, it
would install wood mouldings. For a better fit, it is advised that
may then be secured with 4 trim head dry wall screws. Be sure
a flat or "Butt Joint" is used to join longer lengths of polyurethane
to place the screws so that any holes created may be filled and
mouldings. Cut all pieces 1/8th of an inch longer than the
sanded with minimal effort.
required measurement, fitting the ends in place first and the
Finishing
middle sections last. Always place a continuous bead of premium
Before installing moulding, lightly sand and wipe material to avoid
polyurethane adhesive along all adjoining wall and ceiling
any dirt and impurities. This is important to obtain good adhesion
surfaces before final positioning of the moulding. Poly-glue is
and a smooth finish. Comes primed white and ready to finish with
essential when attaching one length of moulding to the next.
a good quality oil or latex based paint.
A pneumatic pin nailer works well for fastening polyurethane
* FRT PRE-PAID ON ORDERS OF $100.00 OR MORE!
mouldings to wall and ceiling surfaces; alternatively, trim head
(unless otherwise specified)
drywall screws or finishing nails may be used.
(GROUND ONLY-NO COD ORDERS)
Filling and Sanding (Within continental U.S.- Excludes AK and HI)
*APPLIES TO "DEM" Series
Once all of the mouldings are fixed in place, fill any joints or
Designers Edge Millwork; other items will not
remaining voids with a paintable siliconized latex caulking. This
qualify and will be packed and shipped separately.
same caulking may be applied sparingly along the top and bottom
The FRT PRE-PAID offer does NOT apply
edges of the moulding where it meets the ceiling and wall. A damp
to the DEM-900 Series of ceiling domes.
cloth or silicone coving tool may be used to clear away any excess
caulking to leave a clean professional look.
Any remaining nail or screw holes may be filled with sandable,
ADH1 $4.66 per 10.6 oz tube
paintable non-shrinking filler. Be careful not to over sand the
PL Premium Adhesive
surfaces of your polyurethane mouldings. Sanding past the
Approximate adhesive yields*
protective barrier undercoating may necessitate further filling
Mouldings 2" + Under - 60'
and sanding to maintain a paintable surface. Mouldings 2 - 5" - 45'
Mouldings 5" + Over - 30'
* yields are approximate and
based on average conditions
and installation technique.
M-663
Architectural Products by Outwater L.L.C. Phone:1-800-835-4400/Fax:1-800-835-4403
Page 663 of 1060
Magnified View - Please use mouse to move page for easier readability